Port of Grimsby Latest News

Port of Grimsby East lock gates completed!

  •       Floodgate conversion now complete
  •       Penning capability now 28 metres in length, 12.8 metres maximum beam
  •       Free flow normally 2 hours either side of high water subject to tides

    Fdocksgate